Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Omni Refits?
#1
I tried to refit a Jagatai omnifighter to one of its other configurations using the 'choose refit kit' option, and HQ said it was going to take 2300 minutes or so. I thought omni configuration swaps were only supposed to take about an hour or two. Am I doing something wrong?
Reply
#2
I'll check the file, might be missing the omni tag
Reply
#3
I've checked a bunch of my Meks as well. They're mostly showing as Class A (Field) but with times in the thousands of minutes, even those for which I have parts in stock. The shortest time I've found so far is 480 minutes for a Sulla fighter conversion, with 660 for a Batu.
Reply
#4
Bumping this back up. I'm seeing the same thing in my campaign. I have an AtB campaign that I've been running for 25 years game-time and am now in the clam invasion. I don't have parts for the refits but they are all in the 1200-2k minute range.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Refits Sidewinder 3 1,081 12-11-2013, 02:42 PM
Last Post: Xenon54z
  Can we improve refits, assign multiple techs? neilfw 1 1,021 11-26-2012, 08:28 PM
Last Post: Xenon54z
  Mech Refits Snowene 8 2,274 12-14-2011, 12:35 PM
Last Post: ralgith

Forum Jump:


Users browsing this thread: 1 Guest(s)